banner
Home blog

Got Your Temperature Test Chamber? Here’s What You Must Do Next!

Got Your Temperature Test Chamber? Here’s What You Must Do Next!

November 28, 2025

I. Receipt Inspection 

1. Physical Verification

  • Confirm equipment model, specifications, and serial number match the contract/packing list to avoid wrong delivery.
  • Inspect the cabinet, door, and control panel for transportation damage (dents, deformation) and ensure pipelines/wiring are intact without loosening.

2. Accessory & Document Check

  • Required accessories: Power cord, sample shelves, sealing rings, wrenches, and other tools (verify against the packing list).
  • Technical documents: Operation/maintenance manual, calibration certificate, warranty card, and qualification certificate (all mandatory for after-sales service).

3. Abnormal Handling

  • In case of damage or missing items: Immediately take photos (overall equipment, damaged details, packing list), notify the supplier within 24 hours to submit a claim, and sign the "Acceptance Objection Form" for documentation.

II. Installation & Deployment (Compliant Installation Ensures Performance)

1. Environment Requirements (Must Meet the Following)

  • Floor: Flat and sturdy, with load-bearing capacity ≥1.2 times the equipment weight (to avoid test errors caused by vibration).
  • Space: ≥30cm ventilation gap around the cabinet; keep away from heat sources, water sources, dust, and strong electromagnetic interference.
  • Power supply: Match the rated voltage (e.g., 380V three-phase five-wire/220V single-phase), grounding resistance ≤4Ω, and equip an independent air switch (power ≥1.2 times the equipment's rated power).
  • Environment: Room temperature 15-35℃, humidity ≤85%RH (no condensation); water-cooled models require pre-connected cooling water circuits meeting specifications.

2. Basic Installation Steps

  • Level the equipment: Adjust anchor bolts and use a level to confirm horizontal alignment (to prevent uneven stress on the refrigeration system).
  • Wiring inspection: Connect the power supply per the manual and ensure correct neutral/grounding connections (a common cause of electrical failures).
  • Consumable check: Confirm refrigerant and lubricating oil (if applicable) are properly filled with no leakage.

III. Commissioning (Core: Verify Performance Compliance)

1. First Startup Procedure

(1) Recheck power/pipeline connections before power-on; switch on after confirmation.

(2)Panel self-test: Ensure the display shows no error codes and buttons/indicators function normally.

(3)No-load operation (2-4 hours):

  • Set a common temperature range (e.g., -40℃~85℃) and monitor temperature fluctuation ≤±0.5℃ (meets industrial standards).
  • Check door sealing (no obvious air leakage), operating noise ≤75dB, and normal start/stop of refrigeration/heating systems.

2. Load Verification (Simulate Actual Usage)

  • Place a load equivalent to the test sample (weight/volume ≤80% of the equipment's rated load) without blocking air ducts.
  • Set the target temperature and holding time; record if the heating/cooling rate meets technical parameters (e.g., -40℃~85℃ heating time ≤60 minutes).
  • Alarm test: Simulate power failure, over-temperature, or door-open timeout to confirm timely alarm response (audio-visual alarm + shutdown protection).

IV. Emergency Handling & After-Sales Coordination

1. Common Fault Resolution

  • Error codes: Refer to the "Troubleshooting" section in the manual (e.g., E1=Over-temperature, E2=Power abnormality).
  • Sudden failures: (e.g., electric leakage, abnormal noise, refrigeration failure) Immediately cut off power, stop use, and contact the supplier's technical support (do not disassemble independently).

2. After-Sales Support

  • Retain the supplier's after-sales contact (phone + email) and confirm the warranty period (usually 1 year for the whole machine).
  • Maintenance records: Request a "Maintenance Report" after each service and file it for future tracing.

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

home

products

WhatsApp

contact us