HUMIDITY & TEMPERATURE TEST CHAMBER OPERATIONAL GUIDELINES
                                    
									                                                Mar 19, 2025
                                            								
                                    
                                        1.Equipment Overview
The Humidity & Temperature Test Chamber, also known as an Environmental Simulation Testing Apparatus, is a precision instrument requiring strict adherence to operational protocols. As a Class II electrical device compliant with IEC 61010-1 safety standards, its reliability (±0.5°C temperature stability), precision (±2% RH humidity accuracy), and operational stability are critical for obtaining ISO/IEC 17025 compliant test results.
2.Pre-Operation Safety Protocols
2.1 Electrical Requirements
 Power supply: 220V AC ±10%, 50/60Hz with independent grounding (ground resistance ≤4Ω)
 Install emergency stop circuit and overcurrent protection (recommended 125% of rated current)
 Implement RCD (Residual Current Device) with tripping current ≤30mA
2.2 Installation Specifications
 Clearance requirements:
       Rear: ≥500mm
       Lateral: ≥300mm
       Vertical: ≥800mm
 Ambient conditions:
      Temperature: 15-35°C
      Humidity: ≤85% RH (non-condensing)
      Atmospheric pressure: 86-106kPa
 
 
3.Operational Constraints
3.1 Prohibited Environments
 Explosive atmospheres (ATEX Zone 0/20 prohibited)
 Corrosive environments (HCl concentration >1ppm)
 High particulate areas (PM2.5 >150μg/m³)
Strong electromagnetic fields (>3V/m at 10kHz-30MHz)
4.Commissioning Procedures
4.1 Pre-Start Checklist
 Verify chamber integrity (structural deformation ≤0.2mm/m)
 Confirm PT100 sensor calibration validity (NIST traceable)
 Check refrigerant levels (R404A ≥85% of nominal charge)
 Validate drainage system slope (≥3° gradient)
5.Operational Guidelines
5.1 Parameter Setting
 Temperature range: -70°C to +150°C (gradient ≤3°C/min)
 Humidity range: 20% RH to 98% RH (dew point monitoring required >85% RH)
 Program steps: ≤120 segments with ramp soak control 
5.2 Safety Interlocks
 Door-open shutdown (activation within 0.5s)
 Over-temperature protection (dual redundant sensors)
 Humidity sensor failure detection (auto-dry mode activation)
6.Maintenance Protocol
6.1 Daily Maintenance
 Condenser coil cleaning (compressed air 0.3-0.5MPa)
 Water resistivity check (≥1MΩ·cm)
 Door seal inspection (leak rate ≤0.5% vol/h) 
6.2 Periodic Maintenance
 Compressor oil analysis (every 2,000 hours)
 Refrigerant circuit pressure test (annual)
 Calibration cycle:
        Temperature: ±0.3°C (annual)
        Humidity: ±1.5% RH (biannual)
7.Failure Response Matrix
Symptom Priority
Priority
Immediate Action
Technical Response
Uncontrolled heating
P1
Activate emergency stop
Check SSR operation (Vf <1.5V)
Humidity oscillation
P2
Initiate auto-dry cycle
Verify dew point sensor calibration
Condenser frost
P3
Reduce humidity setpoint
Check expansion valve (ΔT 5-8°C)
Water level alarm
P2
Refill with DI water
Conduct float switch resistance test
8.Decommissioning & Disposal
 Refrigerant recovery per EPA 608 regulations
 PCB disposal compliant with RoHS Directive 2011/65/EU
 Steel components recycling (≥95% recovery rate)
9.Compliance Standards
 Safety: UL 61010-2-011, EN 60204-1
 EMC: FCC Part 15 Subpart B, EN 55011
 Performance: ASTM D4332, IEC 60068-3-5
 
                                    
                                                                            
                                                                        Read More